Workshop · Semco Maritime × QAECY · 28 October 2026

From software
to data

What a data-centric Semco could look like, for the substations you design and build, and for the wind farms you take over.

Semco Maritime×CuebyQAECY
Today

One day, three modes: inspire, educate, work

09:00
Welcome & introductions
09:30
01  From software to data
Inspire
10:30
Coffee
10:45
02  Substations: boundary conditions, design & planning
Inspire
11:45
03  Wind farm O&M: taking over after the OEM
Inspire
12:30
Lunch
13:15
04  How it works: graphs, meaning, agents, and why codes aren't enough
Educate
14:30
Coffee
14:45
05  Workshop: map your world, find the wicked questions
Work
15:45
Wrap-up & next steps
Why we're here

What we want you to leave with

Inspiration

A picture of what becomes possible when data, not software, sits at the centre of a substation project or a wind farm.

Vocabulary

Semantic models, knowledge graphs, agentic programming: enough to judge what is real, what is hype, and what it means for your systems.

A shortlist

Two or three use cases worth piloting, ranked by you: by business impact and by whether the data is already there.

Who we are

QAECY builds Cue

Cue reads an organisation's documents and data, recognises the things they are about, and connects every mention into one knowledge graph: the Cue Index. People and AI agents can then ask it questions, with a source behind every answer.

Philipp Dohmen
Philipp DohmenCEO & co-founder
Manos Argyris
Manos ArgyrisCTO & co-founder
Mads Holten Rasmussen
Mads Holten RasmussenCIO & co-founder
Your turn

Around the table

Who are you and what do you work on?

Where does information get lost between design, yard and operations?

If your data could answer one question tomorrow, what would you ask?

Two businesses

Two businesses, one data question

Substations

Design, plan and build offshore and onshore substations.

Project businessEvery client differentYard & partners

Blocks 01 and 02 today

Wind farm O&M

Take over operation and maintenance of existing parks when the OEM no longer services them.

Recurring businessGrowth areaPredictive maintenance

Block 03 today

Different businesses, same question: how do you get the most out of data that mostly comes from others: clients, OEMs, TSOs, suppliers?
01

You don't run software.
You run on data.

01 The landscape

Ten systems, ten pictures of your world

ERP

Finance, purchasing, stock, hours

CRM

Customers, bids, contracts, change requests

CAD & 3D

Models, line lists, equipment lists

Document control

Specs, drawings, transmittals, comments

Planning

Schedules, baselines, look-aheads

Weight control

Weight reports, CoG, lift studies

Yard progress

Spreadsheets, punch lists, photos

QHSE

Procedures, NCRs, incidents, audits

Maintenance

Work orders, assets, spare parts

HR & competence

Certificates, training, crews

And in between: Excel exports, e-mail, Teams, status meetings, copy-paste. People are the integration layer.
Every system has its own picture of your world. None of them is yours.
01 Time

Applications come and go. The data stays.

An offshore substation outlives three or four generations of every application around it. Each switch is a migration, and every migration loses context.

01 The ERP question

Why roll out another traditional ERP?

The traditional rollout

  • You adapt your processes to the vendor's data model
  • Multi-year implementation, and a lot of consultants
  • Customisation is expensive and locks you in further
  • Engineering, the yard and the field still live outside it

The data-centric way

  • Model your world as you see it: substations, modules, zones, turbines, tasks
  • Agents build the interfaces each team needs, in days
  • Swap applications, keep the data. Open standards: RDF, OWL, SPARQL
  • Keep ERP for what it's good at: finance, payroll, purchasing
Not "no ERP". ERP as one source among many, not as the model of your company.
01 What changed

When software is cheap, the model is the asset

AI agents now write working software from a description. When an interface costs days instead of months, you stop buying one big system and bending to it.

You generate the interfaces each team needs, all on one shared model of your world.

Semantic
modelyour world, your words
Weight dashboard
Yard progress
Bid assistant
Technician briefing
Change impact
Customer portal
Interfaces
Spares finder
01 Semantic model

Your world, described
in your words

Facts the model holds
OSS-2has partTopside
Module M3containsTransformer T1
T1must satisfyREQ-0412
T1delivered underPO 4500-1832
WP-214located inZone L2-B
InspectionfollowsPR-118 rev 8

Engineering, ERP, CRM, schedule and O&M: one graph, one identifier per thing.

01 Combine

What if it all came together?

ERP

Cost, purchase orders, deliveries, hours

CRM

Customers, contracts, change requests

Yard progress

% complete per zone, punch items, photos: live

Location-based schedule

Which crew works where, and when

One connected model of OSS-2
Reality vs. plan, per location, as it happens
Cost and change traced to the zone and the customer
Early warnings, before the schedule slips
01 Live from the yard

See the topside as it really is

Progress per zone from the yard, compared with the plan for that zone this week.

On plan Ahead Slightly behind Behind
61 %
complete
68 %
planned, wk 33

Two zones behind. One waits for piping, one for a late PO. Both reasons come from other systems.

Illustrative

01 Location-based schedule

Plan vs. reality, per location

Each line is a trade moving through the topside. Where two lines meet, two crews want the same zone at the same time.

Illustrative

01 Ask

Questions no single system can answer

Which late purchase orders block zones where E&I starts in the next six weeks?
ERPScheduleModel
Three POs: cable trays (L3-A), UPS (L3-C), HVAC dampers (L2-C). First impact in week 35.
How does our E&I productivity per zone compare with plan, and with OSS-1?
YardScheduleHistory
−14 % on L2. OSS-1 had the same dip on deck 2: late piping handover.
Which customer change requests touched the transformer bays, and what did they cost?
CRMERPDocuments
CR-019 and CR-031: 11 documents revised, +€0.42 M, +18 t.
If module M3 slips two weeks, when is the earliest sail-away?
ScheduleModelWeather
Week 47 instead of 45, unless L3 gets an E&I night shift (cost estimate attached).

Illustrative answers

01 Keep the clay wet

Don't freeze the design before you have to

Most early decisions aren't taken because they must be. They're taken because nobody can see what depends on them.

Decide nowTransformer configuration: 70-week lead time puts it on the critical path.
Keep openGIS layout: nothing depends on it until week 30.
01 The last responsible moment

Know the consequences before freedom runs out

Freedom to change drops fast. Knowledge about consequences arrives late, usually when steel is being cut. Connected data moves that knowledge forward, so you can decide later and with better information.

01 How

What keeps the clay wet

Decisions as data

Every decision linked to its assumptions, the requirements behind it and the items it fixes. Change an assumption, see which decisions wobble.

Options side by side

Carry two or three configurations in the model and compare weight, cost and schedule on demand, not in a two-week study.

Real deadlines

The last responsible moment, computed from supplier lead times (ERP) and the installation sequence (schedule), not from habit.

Impact on demand

"What changes if…" answered in minutes. Late changes stop being scary when you can see exactly what they touch.

02

Substations:
design & planning

02 Boundary conditions

The design starts outside the design

Before the first line is drawn, the seabed, the sea, the wind farm, the vessels and the market have already decided a lot.

Most of it arrives as reports and spreadsheets from other parties, and it changes along the way.

02 Boundary conditions

What sets the boundaries? Let's talk.

Seabed & geotechnics

Soil profiles, CPTs, boulders, UXO, scour

How late can new CPT data still change the pile design?

Metocean

Waves, wind, current, air gap, ice

Who owns the design basis when the data is updated?

The wind farm

Capacity, number of turbines, array voltage, layout

What changes on the topside if the client adds 100 MW?

Grid connection

TSO requirements, grid codes, onshore connection point

Where do grid-code changes enter your design?

Installation vessels

Crane capacity, availability, weather windows

What if the heavy-lift vessel slips six weeks?

Ports & yard

Quay capacity, draught, laydown, load-out

Which yard limits shape the module split?

Permits & environment

Consent conditions, piling noise, marine life

Which consent conditions reach the detailed design?

Supply chain

Lead times for transformers, GIS, cables; prices

Which long-lead items decide the schedule today?

Which of these arrive as data, which as PDFs, and who tells you when they change?
02 Boundary conditions

One outside fact, a chain of decisions

Follow a single boundary condition into the design.

Heavy-lift vesselCrane capacity and availability in the installation window
Max lift weightTopside incl. rigging, contingency and weight growth
Transformers & module splitTwo large units or three smaller ones? One lift or two?
Layout & deck heightsBays, fire walls, CoG envelope
Jacket & pilesLoads checked against the seabed data
Yard sequence & sail-awayFabrication order, load-out, weather window

In documents

The vessel slips six weeks. Someone has to remember which studies, drawings and purchase orders depend on it, and who owns them.

In a graph

The constraint is linked to everything it limits. Change it, and the whole chain lights up, with the documents and owners attached. That is what keeps the clay wet.

02 Anatomy

One asset. Many thousands of facts.

Thousands of requirements, tens of thousands of documents, hundreds of suppliers, and it has to work for decades without anyone living on it.

02 Use cases

Where Cue helps in design & planning

Requirements traceability

Every clause from client specs, grid codes and standards, linked to the item that must satisfy it, with status.

SpecsStandardsDatasheets

Change impact

A change request in, a full impact out: weight, CoG, documents, POs, schedule.

CRMModelERPSchedule

Weight & CoG control

Weight reports reconciled with the model and vendor data continuously, not only at milestones.

Weight reportsVendor dataModel

Interface management

Jacket, topside, cables, TSO, client: every interface as data, with an owner, a status and the correspondence behind it.

Interface registerE-mailMinutes

Tender & reuse

"Have we done this before?" Similar past projects, their lessons and their real numbers.

Past projectsERPLessons learned

Document control

Latest revision, open comments, who is waiting on whom: asked, not searched.

DMSTransmittalsComments
02 Use case · Requirements traceability

From clause to component, with evidence

Client technical specification · rev 4p. 112

7.3 Main power transformers

7.3.2 The EQUIPMENTmain power transformers shall have a sound power level not exceeding VALUE85 dB(A) at MODEONAF cooling.

7.3.4 Tank and radiators shall be protected for corrosivity category STANDARDCX per ISO 12944.

7.3.7 Transport weight per unit shall not exceed VALUE285 t.

7.3.9 ACTIVITYFactory acceptance tests shall be witnessed by the ORGCompany.

RequirementLinked toEvidenceStatus
REQ-0412
Sound ≤ 85 dB(A)
T1, T2Datasheet rev C: 82 dB(A)Compliant
REQ-0415
Coating CX
T1, T2 tanksCoating spec CS-07Compliant
REQ-0419
Weight ≤ 285 t
T1, T2Vendor GA rev B: 291 tDeviation
Query raised
REQ-0421
FAT witnessed
T1ITP rev 2Open

Across the project: 1,284 requirements in 46 specifications. 37 have no linked item yet.

Illustrative

02 Use case · Change impact

CR-031: the customer asks for +10 % transformer rating

What does it touch? Today: two weeks of meetings. With a connected model: a query.

  • +18 t topside weight, CoG +0.6 m east: jacket & lift check
  • 11 documents to revise across 3 disciplines
  • PO 4500-1832 variation: +9 weeks, set-in moves to week 40

Illustrative

02 Onshore

Same model, other end of the cable

  • Signal lists and protection settings kept consistent from offshore to onshore
  • TSO and grid-code requirements traced like client specs
  • One interface register for both ends of the export cable
02 Use case · Tender & reuse

"Have we done this before?"

We're bidding a 1.2 GW AC offshore substation for the North Sea, delivery 2030. What have we done that's similar, and what did we learn?
Searched 14 past projects: specs, lessons learned, ERP actuals
Ranked by capacity, voltage, region and topside type
Pulled the three lessons that cost the most
ProjectSimilarityTopsideLesson that cost the most
Project A
900 MW · North Sea · 2023
High3,900 tLate transformer vendor data caused three weight re-baselines
Project B
1.0 GW · Baltic · 2025
High4,400 tE&I started before piping handover: 11 % productivity loss
Project C
750 MW · Irish Sea · 2021
Medium3,100 tJ-tube design frozen too late for the cable installer
Lessons learned A, B, CERP actualsClose-out reports

Illustrative: project names anonymised

03

Wind farm O&M:
taking over parks

A different business: running existing wind farms after the OEM, and growing it.

03 Where Semco comes in

A park comes with ten years of someone else's data

Build
OEM service & warranty
Vestas, Siemens Gamesa
Independent O&M: Semco
the business to grow
Life extension
or repowering
Year 0~ Year 1–10Year 10+Year 25+

You inherit the history

OEM service reports, SCADA history, component swaps and retrofits. In OEM formats and codes, and rarely complete.

Productive from day one

Known issues, procedures, spare parts and bulletins have to be understood before the first boat leaves.

Know the park before you bid

Growing means winning more parks. The faster you read a data room, the sharper the price and the lower the risk.

03 The fleet

Every park you take over is a new fleet, with someone else's paperwork

  • Years of OEM service reports, SCADA history and modifications
  • Different turbine types, codes and document systems per park
  • Technicians, certificates, vessels, weather windows, spare parts
03 Use cases

Where Cue helps in wind farm O&M

Takeover & due diligence

Read the data room before the bid, and turn it into one history per turbine after the win.

OEM reportsSCADARegisters

Predictive maintenance

Signals plus context: which turbine, which component, why now, and what it shares with failures elsewhere.

SCADACMSInspectionsBulletins

Work-order preparation

Everything the team needs for this task on this turbine, in one pack, before they leave port.

CMMSProceduresHistory

Spares & logistics

In stock, on the vessel or eight weeks away, matched against the weather window.

ERPVessel planForecast

Competence & briefings

New park, new turbine type: who knows the procedures, and who needs a briefing first?

HRTrainingProcedures

Reporting & contracts

The owner's report written from field data, and every task checked against the service agreement.

Field dataContractsCRM
03 Use case · Park takeover

From data room to one history per turbine

The data room
OEM service reports · PDF SCADA export · CSV Component register · OEM codes Modification & retrofit log Warranty claims Inspection photos
WTG C03 · history since 2015connected from 7 sources
2015CommissionedAs-built
2019Gearbox exchanged after oil-debris alarmOEM reportSCADA
2022Leading-edge repair, blades A and CRetrofit log
2024Pitch bearing B replaced: OEM no. 4471-B, batch 7731RegisterWarranty claim
2026SB-2026-14 applies to batch 7731OEM bulletin
Gaps: 3 turbines have no 2021 inspection report. Ask for them before the bid.

Use it twice: due diligence before the bid, mobilisation after the win.

Illustrative

03 Predictive maintenance

Signals say something is changing. Context says why it matters.

  • SCADA and condition monitoring spot the change
  • The graph adds context: same batch, same bulletin, same failure in another park
  • Ranked by risk and cost, with the work pack ready

Illustrative risk scores

03 Predictive maintenance

Signals + context = a prediction you can act on

TurbineComponentSignalContext from the graphRisk 90 dAction
C03Pitch bearing BGrease leak at segment 4Batch 7731, SB-2026-14; 2 failures from this batch in Park B72 %Inspect and re-grease per rev 8
B05Pitch system14 alarms in 30 daysSame alarm pattern preceded a hydraulic failure on A04 in 202564 %Add to next CTV trip
E02GearboxVibration +18 %Gearbox exchanged 2019; oil debris rising since spring41 %Oil sample on next visit

Signals alone

Find anomalies. Many are harmless, so they get ignored.

Context

Batches, bulletins, repair history and other parks explain which anomalies matter.

Every new park helps

More parks under one model means more examples to learn from. Growth and prediction feed each other.

Illustrative

03 Use case · Work-order preparation

The work pack writes itself

WTG C03 · Pitch bearing inspection, blade BWO-88140 · planned Tue 12 Nov · prepared by Cue from 7 sources
History3 earlier inspections; grease leakage at segment 4 in March 2026 (photo)Inspection reports
ProcedurePR-118 rev 8: changed since this crew last did the taskProcedure library
BulletinSB-2026-14 applies to this blade bearing batchOEM portal
SparesSeal kit × 2 in stock, Esbjerg; grease 4 × 18 kgERP
SafetyNo HV work; hub entry needs a confined-space permitPermit system
CrewAnna K.: GWO ✓, rev 8 briefing ✗ · Jonas P.: GWO ✓, briefing ✓HR · Training
WeatherWindow Tue 06:00–15:00, Hs 1.2 mForecast
Flagged

The procedure changed, a bulletin applies, and one technician hasn't been briefed.

Today this takes a planner an hour per work order, and the flags depend on someone remembering.

Illustrative

03 The competence gap

The procedure changed.
Did the technician?

PR-118 Pitch bearing inspectionrev 7 → rev 8
4.2 Clean the seal area with a lint-free cloth.
4.3 Apply grease until fresh grease is visible at the seal lip.
4.3 Apply 380 g grease per nipple, max. 2 strokes per 10 s. Do not over-grease: seal lip damage (SB-2026-14).
4.5 Photograph each seal segment and upload to the work order.
4.6 Check pitch bearing bolts: 10 % sample, 2,400 Nm.
4.6 Check pitch bearing bolts: 100 %, 2,550 Nm, cross pattern.
AK
Anna K.
Service technician
Last did this taskMarch 2025 · rev 6
Changes since5, across rev 7 and 8
BriefingNot done

Requirements change faster than people can read them. The gap is where incidents and rework come from.

Illustrative

03 From requirements to formats people use

Cue knows what changed, for whom, for which task

Procedures & revisions OEM service bulletins HSE alerts & regulations Turbine history Lessons learned Training records
Cue

Compares revisions, matches them to the task, the turbine and the person, and writes the briefing from the sources.

Podcast briefing

Eight minutes on the CTV transit

Video instructions

Step by step, in the technician's language

AR guidance

At the component, hands-free

Check & sign-off

Three questions, acknowledged, traceable

03 Podcast briefing

Briefed on the boat, not on paper

Morning briefing
WTG C03 · Tue 12 Nov
02:41 / 08:12EN · DA · PL
PR-118 rev 8SB-2026-14C03 history

HostMorning. You're heading to C03 today: pitch bearing inspection on blade B. Two things have changed since you last did this task.

ExpertFirst, greasing. It's no longer "until you see fresh grease". It's 380 grams per nipple, at most two strokes every ten seconds. The OEM found seal-lip damage from over-greasing; that's service bulletin 14.

HostSecond: C03 had grease leakage at segment 4 in March. Photograph every segment this time; the photos go straight into the work order.

ExpertSeal kits are already on the vessel. Weather window closes at three. Stay safe out there.

Illustrative script, generated from the sources shown

03 Video instructions

Generated from the procedure, rendered from the model

LOCK00:00
1 · Lock the pitch systemRotor lock engaged, pitch in maintenance mode.PR-118 §3.1
00:24
2 · Clean the seal areaLint-free cloth, all segments.PR-118 §4.2
380 g00:51New in rev 8
3 · Grease: 380 g per nippleMax. 2 strokes per 10 s. Don't over-grease.PR-118 §4.3 · SB-2026-14
01:20New in rev 8
4 · Photograph each segmentUploads straight to WO-88140.PR-118 §4.5
Rendered in the technician's language: EnglishDanskPolskiDeutsch
03 AR in the field

Hands-free, at the bolt, always the current revision

  • Step-by-step guidance anchored to the component
  • Changes since your last visit flagged in view
  • Torque values logged by the tool, straight into the work order
WO-88231WTG D04 · TOWER T2/T3REC ●
03 Closing the loop

Field data flows back

Photos, torque values and findings from the task go back into the Cue Index. Fleet patterns surface, procedures get better, and the next briefing is sharper.

Fewer repeat visitsEvidence for the ownerWarranty claims with proof
04

How it works

Semantic models, knowledge graphs and agents, without the hype.

04 From documents to answers

Read. Recognise. Connect.

1

Read every page

Inspection of TURBINEWTG C03 on DATE14 Mar 2026 by PERSONJ. Pedersen found grease leakage at LOCATIONsegment 4 of the blade B pitch bearing, per DOCUMENTPR-118 rev 7.

PDFs, scans, spreadsheets, drawings, e-mail, in any language.

2

Recognise the things

WTG C03Turbine · 214 mentions
PR-118Procedure · 8 revisions
J. PedersenTechnician · 61 tasks
Segment 4Location on bearing

"C03", "WTG-C03" and "turbine C3": one thing, not three.

3

Connect into a graph

WTG C03PR-118J. PedersenSegment 4Inspection

Every fact keeps a link to the page it came from.

Stop searching. Start asking.

04 What is a graph?

Things, and how they relate

Nodes

The things: a turbine, a bearing, a bulletin, a person.

Edges

How they relate. Named, directed, and data in their own right, not hidden in a join table.

Properties

The details, on nodes and on edges.

No fixed shape

A new kind of thing or relation is just another node or edge.

has part from batch applies to inspected performed took 2 h 15 min TurbineWTG C03 ComponentPitch bearing B OEM no. 4471-B · 2024 BatchBatch 7731 BulletinSB-2026-14 TaskInspection 14 Mar 2026 · leak at segment 4 TechnicianAnna K.
04 Knowledge graph 101

A fact is three things

Transformer T1 — must satisfy → REQ-0412 Subject, predicate, object: a fact that people and machines can both read.

Ontology: your vocabulary

SubstationModuleEquipmentRequirementZoneWork packageTurbineTask
has partlocated inmust satisfydelivered underfollows

Defined once, in Semco's terms. Changes when your business changes, not when a vendor releases.

Instances: your facts

OSS-2Module M3T1REQ-0412L2-BWP-214WTG C03

Millions of them, from every system and document, each with one identifier.

Open W3C standards: RDF · OWL · SPARQLNo lock-in: your graph is portableOne identifier per thing, across every system
04 Why graphs are flexible

New questions, new edges. Nothing breaks.

Day 1 · asset register
has part Turbine Component

Turbines and their parts, with RDS-PP codes as properties.

Day 30 · a bulletin arrives
from batch applies to Turbine Component Batch Bulletin

Two new kinds of edge. The register is untouched.

Day 90 · logistics
on needs limited by Component Task Vessel Weather window

Tasks, vessels and weather join. Day-1 questions still work.

Tables: new tables, a migration, and every report that joins them needs fixing. So the change is postponed.
Graph: add the edges. The model grows with the business, one question at a time.
04 Querying by meaning

Ask for what things are, not what they're called

The ontology says
  • Component
    • Rotating equipment
      • Bearing
        • Pitch bearing
        • Main bearing
        • Yaw bearing
      • Gearbox
      • Generator
# Which bearings come from a batch named in SB-2026-14?
SELECT ?bearing ?turbine WHERE {
  :SB-2026-14  :appliesTo  ?batch .
  ?bearing     a/rdfs:subClassOf*  :Bearing ;
               :fromBatch  ?batch ;
               :partOf     ?turbine .
}
Asking for Bearing also finds pitch, main and yaw bearings, because the ontology says they are bearings.
Ask for Rotating equipment and gearboxes and generators come along. Nobody had to tag them twice.
"C03", "WTG-C03" and "turbine C3", in English, Danish or OEM speak, point to one identifier.
04 Agents query by meaning too

An agent reads your vocabulary, then asks the graph

Which turbines have bearings from the batch in SB-2026-14, and were any of them greased the old way since March?
index_schemaRead the vocabulary: Bearing, Batch, Bulletin, Task, Procedure
index_searchFind SB-2026-14 and the batch it names
index_traverseFollow applies to → from batch → part of → inspected
Keep tasks done under PR-118 rev 7 or earlier

The agent never needs your table names. It reads what your things mean, over MCP, and every step stays traceable.

Answer

9 turbines in 2 parks carry bearings from batch 7731. 3 were greased under rev 7 since March: B05, C03, E02.

SB-2026-14WO-87112WO-87440WO-87903

Suggested next step: brief the C03 crew before Tuesday.

Illustrative · tool names from the Cue MCP server

04 RDS-PP

A code for every thing

The Reference Designation System for Power Plants gives each object in a wind farm or substation an unambiguous, hierarchical code.

#DK.NSA01Conjoint
the plant
=G001Main system
wind turbine 1
MDA10System
rotor system
BT002Basic function
temperature measurement
=

Function

What it does. The backbone of the designation.

−

Product

What realises it: the transmitter -BT001 and its cable -WG001.

+

Location

Where it sits: in a cabinet (+) or in a space such as the nacelle (++).

Valuable: one code across owner, OEM and service company, and asked for by many owners.

VGB / vgbe RDS-PP for wind; example after soedera.eu

04 Codes and graphs

A code shows one perspective. A graph carries many.

RDS-PP · function aspect
Wind farm#DK.NSA01 WTG C03=G014 Rotor systemMDA Pitch system, blade B Pitch bearing One tree per aspect. Every thing has exactly one parent, seen from one point of view.
Pitch bearing · B · C03 =G014 MDA…RDS-PP, function ++ hubRDS-PP, location 4471-BOEM part, batch 7731 SB-2026-14applies to the batch 8 more in Park Bsame batch, other owner Inspection 14 MarPR-118 rev 7 · Anna K. WTG03-PB-Bowner's CMMS tag PO 4500-2981warranty until 2029
RDS-PP says what a thing is and where it sits. The graph keeps that, adds what it is connected to, and links the owner's, the OEM's and your own codes for the same bearing.

Illustrative designations

04 Architecture

Data at the centre

People & agents
EngineersPlannersYardTechniciansCustomersAI agents
Interfaces
generated, cheap, many
DashboardsAssistantsWork packsPodcasts & videoARReportsCustomer portal
MCP · SDK · SPARQL
Cue Index
CueSemantic modelKnowledge graphDocumentsPermissionsProvenanceHistory
Connectors and document reading
Sources
stay where they are
ERPCRMDocument controlCAD & 3DSchedulesYard trackingCMMSSCADAHRFile shares
04 Agentic programming

Describe the app. The agent builds it on your model.

Build a dashboard of E&I progress per zone vs. plan for OSS-2. Flag zones more than 10 % behind and tell me why.
Read the model: Zone WorkPackage ProgressReport
Query planned vs. actual E&I per zone, week 33
Find reasons: open punch items, late POs, handovers
Build and publish the app for the yard team

Built in one conversation. Changed in the next one. Because the model is shared, the next app starts where this one ended.

E&I progress · OSS-2Week 33 · live
L1-A100 / 100
L1-C95 / 100
L2-A86 / 80
L2-B64 / 80
L2-C72 / 75
L3-A30 / 45
L3-B22 / 20
L2-B: waiting for piping handover (6 open punch items).
L3-A: cable trays late, PO 4500-2210, ETA week 35.
04 Trust

Built to be trusted

Every answer has a source

A link to the page, the cell or the record it came from. Click it, check it.

Permissions follow the source

People only see in Cue what they may see in the system it came from.

Full history

Who added what, when and why, and every change can be undone.

Cue doesn't invent facts. No source, no fact.
04 Getting there

Start small. Grow the model.

Data-centric doesn't mean big-bang. Each step pays off on its own.

1

Read

Index the documents of one project or one wind farm.

Weeks
2

Connect

Add ERP, schedule and yard progress for that project.

+ weeks
3

Build

The first agentic apps for one team: briefings, work packs, dashboards.

Days per app
4

Scale

The next project, the whole O&M fleet, the tender team.

Compounding
05

Workshop:
your world

05 Exercise 1

Map your world

  1. List the 10–15 things your business is about.
  2. Draw how they connect, using verbs: contains, located in, must satisfy…
  3. For each thing, mark where it lives today: a system, a document, or someone's head.
Groups of 3–4 · 30 min
Substations
SubstationTopsideModuleRoomEquipmentCableRequirementInterfaceChange request
Yard
ZoneWork packageActivityCrewPunch itemWeight report
O&M
Wind farmTurbineComponentTaskProcedureTechnicianCertificateVesselSCADA alarmService agreementOEM
Commercial
CustomerContractPurchase orderSupplierWarranty
05 Exercise 2

Find the wicked questions

Questions you can't answer today, or that take days. Use this morning's stickies.

QuestionWho asks itWhere the answer livesTime todayWorth of a fast answer
Which turbines got the bearing batch from SB-2026-14, and which were greased the old way since?O&M managerOEM portal, CMMS, work-order PDFs2–3 daysAvoid seal failures; warranty claim
…
…
Same groups · 25 min · 3–5 questions per group
05 Exercise 3

Prioritise

Today's use cases, placed by our guess. Move them, add your wicked questions, and agree on the top-right corner.

Plenary · 30 min
Next steps

Proposal: a focused pilot

Pick one use case

From today's top-right corner. For example a park takeover or technician briefings for one wind farm, or requirements traceability on one substation.

Bring real data

One project or one park. Documents first, then one system: ERP, schedule or CMMS.

Measure what matters

Success criteria defined by you: time to answer, issues found earlier, briefings delivered.

Week 0Kick-off, data access
Week 2First answers on your data
Week 4First generated app or briefing
Week 6Results & decision
Takeaways

Four things to remember

1Your data outlives every application around it. Treat it as the asset.
2A semantic model describes your world as you see it. Agents build the interfaces on top.
3Connected data compares plan with reality, and keeps the clay wet for longer.
4The right knowledge, in the right format, at the right moment, is a safety measure.

Thank you